Fact sheets | 榴莲视频 /resources/types/fact-sheets/ Wed, 28 Oct 2026 17:50:07 +0000 en-US hourly 1 https://wordpress.org/?v=7.1.4 Solar Panels in Your Community /resources/solar-panels-in-your-community/?utm_source=rss&utm_medium=rss&utm_campaign=solar-panels-in-your-community Tue, 27 Oct 2026 05:00:13 +0000 /?post_type=resource&p=53281 Learn more about solar panel materials and how developers take proper safety measures for utility-scale solar facilities in your community. Key Takeaways Solar panels are made of materials like glass, […]

The post Solar Panels in Your Community appeared first on 榴莲视频.

]]>
Learn more about solar panel materials and how developers take proper safety measures for utility-scale solar facilities in your community.

Key Takeaways

  • Solar panels are made of materials like glass, aluminum, copper, and semiconductors commonly found in consumer electronics.
  • Solar panels are designed for durability, but in the event of breakage, damaged panels are typically identified, removed, and replaced. A polymer sealant holds glass in place to help prevent shatter and scatter in the case of damage.
  • The two most used solar cells in the U.S. are: Crystalline Silicon (c-Si) at 79% of new utility-scale capacity added in 2024,1 followed by Thin-Film Cadmium Telluride (CdTe).2 Risk assessments indicate that both c-Si and CdTe panels pose minimal risk to human health in normal conditions or if panels are damaged.
  • Decommissioning plans are designed to return land hosting a solar project to a useful, productive condition at the end of a project鈥檚 operating life.

The post Solar Panels in Your Community appeared first on 榴莲视频.

]]>
Wildlife and Energy Storage /resources/wildlife-and-energy-storage/?utm_source=rss&utm_medium=rss&utm_campaign=wildlife-and-energy-storage Mon, 19 Oct 2026 20:42:44 +0000 /?post_type=resource&p=77972 Similar to other stationary infrastructure, like warehouses, energy storage facilities generally have limited impacts and no unique wildlife interactions.

The post Wildlife and Energy Storage appeared first on 榴莲视频.

]]>
Battery energy storage systems generally have a limited footprint and do not have unique wildlife interactions. However, that does not mean that BESS developers build projects without considering the impacts.

Key Takeaways:

  • Battery energy storage systems (BESS) facilities are similar to stationary infrastructure. With a limited footprint and self-contained units, standalone BESS facilities do not pose a threat to wildlife.
  • BESS developers comply with the requirements of relevant permitting authority or authorities and typically conduct desktop site screening using geographic data layers to identify any potential sensitive resources within the proposed project area.
  • BESS facilities that are co-located with wind or solar projects are typically considered within the overall facility scope when it comes to assessment and management of potential wildlife impacts.

The post Wildlife and Energy Storage appeared first on 榴莲视频.

]]>
The Clean Energy and Environmental Case for the Bipartisan American Affordability and Jobs Act of 2026 (BAAJA) /resources/the-clean-energy-and-environmental-case-for-the-bipartisan-american-affordability-and-jobs-act/?utm_source=rss&utm_medium=rss&utm_campaign=the-clean-energy-and-environmental-case-for-the-bipartisan-american-affordability-and-jobs-act Thu, 08 Oct 2026 18:16:30 +0000 /?post_type=resource&p=77801 The Senate鈥檚 recently introduced Bipartisan American Affordability and Jobs Act of 2026 (BAAJA) represents, if passed, a major opportunity to modernize how America builds clean energy and transmission infrastructure while […]

The post The Clean Energy and Environmental Case for the Bipartisan American Affordability and Jobs Act of 2026 (BAAJA) appeared first on 榴莲视频.

]]>
The Senate鈥檚 recently introduced Bipartisan American Affordability and Jobs Act of 2026 (BAAJA) represents, if passed, a major opportunity to modernize how America builds clean energy and transmission infrastructure while also accelerating significant environmental benefits.

榴莲视频鈥檚 latest analysis, 鈥�The Clean Energy and Environmental Case for the Bipartisan American Affordability and Jobs Act,鈥� outlines how the bill鈥檚 critical provisions on permitting, environmental review, judicial review, and interconnection would address major barriers that keep viable projects from reaching operation. Clean energy stands to disproportionately benefit from these technology-neutral permitting reforms: Solar, wind and energy storage account for 93% of planned 2026 utility-scale additions and roughly 1,742 GW of projects seeking interconnection, compared with 253 GW of gas.

When clean generation or transmission is held up, higher-emitting generation operates longer and opportunities to replace it with lower-emitting resources are lost.

By creating a more predictable path to build, BAAJA can unleash:

  • Over $800 billion in new transmission and clean power infrastructure;
  • 350+ GW of new clean energy;
  • Increased access to low-cost, domestic energy, helping lower consumer prices;
  • A more reliable and resilient grid; and
  • 290 million metric tons of avoided CO鈧� emissions annually 鈥� equivalent to the emissions of 63 million cars.

Download the full fact sheet to discover the environmental case for permitting reform.

Resource uploaded Oct. 9, 2026

The post The Clean Energy and Environmental Case for the Bipartisan American Affordability and Jobs Act of 2026 (BAAJA) appeared first on 榴莲视频.

]]>
Unlocking American Energy Potential /resources/unlocking-american-energy-potential/?utm_source=rss&utm_medium=rss&utm_campaign=unlocking-american-energy-potential Mon, 05 Oct 2026 19:25:08 +0000 /?post_type=resource&p=77688 The Bipartisan American Affordability and Jobs Act of 2026 (BAAJA), introduced on Sept. 30, could deliver major permitting reforms to our grid. A modernized, more predictable permitting process can advance […]

The post Unlocking American Energy Potential appeared first on 榴莲视频.

]]>
The Bipartisan American Affordability and Jobs Act of 2026 (BAAJA), introduced on Sept. 30, could deliver major permitting reforms to our grid. A modernized, more predictable permitting process can advance critical transmission, unblock clean energy projects, and provide greater regulatory certainty, driving investment, lowering energy costs, and strengthening grid reliability for communities across the country. 听

This fact sheet outlines how the BAAJA can unlock American clean energy potential, including by:

  • Expanding Transmission Capacity: Expanded transmission projects could enable an estimated 200 GW+ of clean energy development. 听
  • Removing Gridlocks: The legislation will help move forward clean energy projects, including the 100 GW+ of projects that have been blocked or delayed by permitting and regulatory barriers. 听
  • Increasing Transfer Capacity: New transmission capacity typically delivers ~1.4x clean energy development 鈥� connecting abundant, low-cost American wind and solar resources to the customers that need them.听
  • Delivering Wins for American Communities: Unlocked projects could lower consumer prices, build a more reliable grid, and support nearly five million jobs in communities across the country. 听

听Check out the full fact sheet for more information on how the BAAJA could deliver major clean energy wins for the American people. 听

Resource uploaded Oct. 5, 2026

The post Unlocking American Energy Potential appeared first on 榴莲视频.

]]>
Summary: Permitting Reform Package /resources/summary-permitting-reform-package/?utm_source=rss&utm_medium=rss&utm_campaign=summary-permitting-reform-package Mon, 05 Oct 2026 12:00:58 +0000 /?post_type=resource&p=77704 The one-pager and detailed summary are based on the legislative text released on September 30, 2026, the Bipartisan American Affordability and Jobs Act of 2026. The bill provides three principal […]

The post Summary: Permitting Reform Package appeared first on 榴莲视频.

]]>
The one-pager and detailed summary are based on the legislative text released on September 30, 2026, the Bipartisan American Affordability and Jobs Act of 2026.

The bill provides three principal protections for projects:

  • Certainty for projects that already have their federal approvals
  • Enforceable deadlines for projects still in permitting
  • Significant remedies for systematic disparate treatment of particular project types

It also makes broad changes to:

  • Federal transmission siting, planning and cost allocation
  • NEPA
  • Clean Water Act
  • Endangered Species Act
  • Historic-preservation review
  • Federal-land renewable-energy permitting

Resource uploaded October 5, 2026

The post Summary: Permitting Reform Package appeared first on 榴莲视频.

]]>
National Utility Scale Solar Wildlife Guidelines /resources/national-utility-scale-solar-wildlife-guidelines/?utm_source=rss&utm_medium=rss&utm_campaign=national-utility-scale-solar-wildlife-guidelines Thu, 01 Oct 2026 15:41:55 +0000 /?post_type=resource&p=77634 Developed jointly by 榴莲视频, the Association of Fish and Wildlife Agencies (AFWA), and the Energy and Wildlife Action Coalition (EWAC), the first-ever National Utility-Scale Solar Wildlife Guidelines represent an unprecedented […]

The post National Utility Scale Solar Wildlife Guidelines appeared first on 榴莲视频.

]]>
Developed jointly by 榴莲视频, the Association of Fish and Wildlife Agencies (AFWA), and the Energy and Wildlife Action Coalition (EWAC), the first-ever National Utility-Scale Solar Wildlife Guidelines represent an unprecedented collaboration among industry leaders and state fish and wildlife agencies to advance responsible utility-scale, ground-mounted PV solar development across the country.

The voluntary guidelines reflect a shared commitment to improving outcomes for both energy development and wildlife conservation and are intended to promote early engagement, informed decision-making, and collaborative problem-solving among solar developers and state fish and wildlife agencies. They cover PV solar project planning through operations and decommissioning, and provide a framework for identifying, avoiding, and reducing potential impacts on wildlife while supporting responsible solar energy development.

The post National Utility Scale Solar Wildlife Guidelines appeared first on 榴莲视频.

]]>
Fact Sheet: Speed to Market /resources/fact-sheet-speed-to-market/?utm_source=rss&utm_medium=rss&utm_campaign=fact-sheet-speed-to-market Tue, 25 Aug 2026 12:00:35 +0000 /?post_type=resource&p=76615 Clean energy is the fastest to deploy to meet rising energy demand and power the American economy.

The post Fact Sheet: Speed to Market appeared first on 榴莲视频.

]]>
As U.S. energy demand continues to grow, we need more energy, and we need it fast. Luckily, clean power projects are ready to meet this growing need, on the timescales that new technologies need. 榴莲视频 Research team鈥檚 newest Speed to Market analysis shows how clean power projects are faster to both build and connect to the grid, enabling future load growth without relying on costlier thermal units or putting upward pressure on system-wide prices.

The difference is clear:

  • Faster to build: Clean power projects spent an average of less than a year in development last year, while gas turbines spent two to three years in advanced development and construction.
  • Faster to connect: Due to its robust project pipeline, clean power projects take six months听to two years to connect to the grid, whereas unplanned gas generators can take an average of five to seven years.

Clean energy is keeping our country鈥檚 grid stronger and less reliant on slower, costlier sources of energy. To quickly and affordably meet future energy needs, we need to leverage the speed and low cost of clean energy projects.

 

The post Fact Sheet: Speed to Market appeared first on 榴莲视频.

]]>
Considerations for Stormwater Pollution Prevention /resources/considerations-for-stormwater-pollution-prevention/?utm_source=rss&utm_medium=rss&utm_campaign=considerations-for-stormwater-pollution-prevention Tue, 23 Jun 2026 15:51:54 +0000 /?post_type=resource&p=74737 A Solar Developer鈥檚 Guide to Contracts, Vegetation, and Effective Management

The post Considerations for Stormwater Pollution Prevention appeared first on 榴莲视频.

]]>
Stormwater management is a critical component of utility-scale solar development.

To navigate the challenges of large, multiphase construction efforts, regulatory compliance, and timely site stabilization, Developers must proactively plan, communicate clearly among stakeholders, and strategically design contracts. Intentional stormwater pollution prevention efforts support positive environmental and economic outcomes and strengthen public trust in solar development.

Key themes include:

  • Clarifying roles and responsibilities between Developers, contractors, and any relevant third-party stakeholders
  • Embedding oversight and enforcement mechanisms into contract language to reduce ambiguity and streamline decision-making
  • Anticipating vegetation management needs beyond construction completion to avoid costly delays in permit closure
  • Navigating state-specific permit requirements and understanding how they can impact ownership, transferability, and compliance obligations.

By incorporating these considerations early and thoroughly, Developers can reduce risk, improve coordination with contractor partners, and accelerate the path to final stabilization and permit termination.

Resource added 6/23/26

The post Considerations for Stormwater Pollution Prevention appeared first on 榴莲视频.

]]>
Fact Sheet: Building an Affordable California Act /resources/fact-sheet-building-an-affordable-california-act/?utm_source=rss&utm_medium=rss&utm_campaign=fact-sheet-building-an-affordable-california-act Sun, 10 May 2026 00:06:57 +0000 /?post_type=resource&p=74684 The Building an Affordable California Act modernizes California鈥檚 approval process for the critical clean energy projects needed to meet rising energy demand and the state鈥檚 climate goals.听 The ballot initiative […]

The post Fact Sheet: Building an Affordable California Act appeared first on 榴莲视频.

]]>
The Building an Affordable California Act modernizes California鈥檚 approval process for the critical clean energy projects needed to meet rising energy demand and the state鈥檚 climate goals.听

The ballot initiative streamlines the 55-year-old California Environmental Quality Act, shaving an estimated three to seven years from development timelines without sacrificing environmental protections.听

For clean energy, the initiative:

  • Sets enforceable timelines for public agencies to complete environmental reviews and issue decisions under the law, addressing delays that eat up years today.
  • Sets timelines for judicial review, helping prevent common abuses of CEQA lawsuits to slow projects.
  • Eliminates requirements for project developers to evaluate an unlimited number of alternatives to any proposed project, requiring analysis instead of just one alternative and a 鈥渘o project鈥� scenario.
  • Creates objective standards of review, providing that project challenges must be based on written standards such as local ordinances, environmental laws or zoning standards.

The reforms in the initiative, which has qualified to appear on the November ballot, will cut down on bureaucratic delays and help ensure California鈥檚 landmark environmental law stays true to its original purpose.

The post Fact Sheet: Building an Affordable California Act appeared first on 榴莲视频.

]]>